Can you quote from a rent roll?
Planning range yes; bid packet no - the written number is the one your contractor holds you to.
Apartment & Multi-Unit
Counted by unit type, phased around occupied units, installed by our crews.
The argument
A building with 30 units may have four or five window styles used many times. One small measuring mistake can affect many windows and lead to extra costs. The problem may not show up until the installation team arrives and finds that a window does not fit.
That is why we visit the site and check each repeated window type. We measure the openings and compare them with the plans. This helps us catch problems early and avoid delays during installation.
Method
What each is, what decides between them, schedule impact, and what we supply either way.
| Retrofit | Full-frame | |
|---|---|---|
| What it is | New sash/unit into an existing frame in acceptable condition | Frame and unit replaced as a system |
| What decides | Frame condition - determined at the walk, not from a photo | |
| Schedule | Faster per opening when frames are sound | More invasive; more coordination with finishes |
| We supply & install | Yes | Yes |
Occupied buildings
Nobody can turn a whole building at once. Match phases to turnover where possible; otherwise keep each occupied unit to a single day. Material lands close to the day it's needed - pallets sitting in a courtyard for three weeks get damaged and generate complaints.
To quote
How it runs
Verify repeats and frame condition.
Conditions counted the way the building actually repeats.
Written number your contractor can hold.
Material timed to the work, not the courtyard.
Our crews through documentation handoff.
FAQ
Planning range yes; bid packet no - the written number is the one your contractor holds you to.
Depends on the job. Ask when we schedule the site walk - we will tell you what the city expects for that scope.
Quoted per line and season after the walk verifies unit types.
We check what was installed and what production still supports, then say what will match.
John on site coordination. Tony on scope and pricing.