Two-story home with fiberglass-clad windows and a clay tile roof

Apartment & Multi-Unit

4.8 Google rating

Apartment & Multi-Unit Window Retrofit in San Jose

Counted by unit type, phased around occupied units, installed by our crews.

The argument

Repeated Window Types Need Careful Checks

A building with 30 units may have four or five window styles used many times. One small measuring mistake can affect many windows and lead to extra costs. The problem may not show up until the installation team arrives and finds that a window does not fit.

That is why we visit the site and check each repeated window type. We measure the openings and compare them with the plans. This helps us catch problems early and avoid delays during installation.

Method

Retrofit vs full-frame

What each is, what decides between them, schedule impact, and what we supply either way.

RetrofitFull-frame
What it isNew sash/unit into an existing frame in acceptable conditionFrame and unit replaced as a system
What decidesFrame condition - determined at the walk, not from a photo
ScheduleFaster per opening when frames are soundMore invasive; more coordination with finishes
We supply & installYesYes

Occupied buildings

Vacancy is the cheapest window you'll ever install

Nobody can turn a whole building at once. Match phases to turnover where possible; otherwise keep each occupied unit to a single day. Material lands close to the day it's needed - pallets sitting in a courtyard for three weeks get damaged and generate complaints.

To quote

Bring what you have

  • Address and unit count
  • Opening count or unit types
  • Prior partial replacement history
  • Target start
  • Plans if any
  • Whether a contractor is engaged
  • Anything needing matching

How it runs

Five steps

  1. 01

    Site walk

    Verify repeats and frame condition.

  2. 02

    Unit-type schedule

    Conditions counted the way the building actually repeats.

  3. 03

    Spec & pricing

    Written number your contractor can hold.

  4. 04

    Phase release & delivery

    Material timed to the work, not the courtyard.

  5. 05

    Install & warranty docs

    Our crews through documentation handoff.

Service area & brands

South Bay multi-unit work

nine cities and areas on service areas.

All brands

FAQ

Multi-unit questions

Can you quote from a rent roll?

Planning range yes; bid packet no - the written number is the one your contractor holds you to.

Who handles permits?

Depends on the job. Ask when we schedule the site walk - we will tell you what the city expects for that scope.

What about lead times?

Quoted per line and season after the walk verifies unit types.

Can you match earlier phases?

We check what was installed and what production still supports, then say what will match.

Who runs it day to day?

John on site coordination. Tony on scope and pricing.

Schedule a site walk.

A board needs a document. An owner needs somebody to come look.